レイセオン社がオーストラリア政府に提出した、そうりゅう型と自社SEA1000潜水艦戦闘システムによるコリンズ型後継潜水艦の提案書
http://www.aph.gov.au/DocumentStore.ashx?id=5e717c69-0513-4da4-8b3d-edb028ea2d68&;subId=301983

6.5 PHASE 3 (BUILD)
Location: Japan and Australia.
This phase initiates the construction of the submarine to the selected design and build strategy and
is followed by approximately two years of testing, trials and operational evaluation.
Although there are many variables and options which will need to be considered for this critical phase,
the following elements provide the basis to meet the political and economic imperatives of the program:
* Construction of submarine sections in Japan (with a level of pre-outfitting completed as part of
this construction) by the Japanese builder.
(日本の日本の造船メーカで、潜水艦本体の製造)
* Shipping of the pre-fabricated sections to Australia for final ‘fit-out’ prior to consolidation.
(最終艤装のためのオーストラリアへの輸送)
* Integration of the combat system into the hull sections by the CSSE and Australian
(レイセオンオストラリアのCSSEとオーストラリア人による、ハルセクションへの戦闘システムの据付)


そうりゅうにレイセオンのシステムを搭載した場合の戦闘能力は米海軍でも評価済だと思われる